---Scenery Progress ---
The building work for the new railway having been finished I
moved in early in 2021. I completely dismantled the old railway
keeping all the buildings stock and extras. All the old stands
and baseboards were demolished, everything else packed carefully
into a huge number of boxes. The work carried out is shown below
on a month by month basis. The latest developments coming up
first. The start is at the bottom of this page
May 2022
Started working on the
long run down the back of the railway. First level of works:
the aim is to colour in the base board with near enough the right
sort of colouring and then add ballast to the track where most of
the movement takes place. small sidings and shed approaches are
often just ash coverings so I used Mars Black with dashes of green
and brown as a start.
Working from the ground up!